Mastic is perfect for a temperate climate – it forms a coating that is resistant to cracking due to frost and aggressive substances in the soil. Thanks to its thixotropic properties, the coating does not flow from vertical surfaces even at high temperatures.
The aim:
• for repair of bitumen coatings, tin, metal tiles and other roof coverings.
• for surface priming, after diluting with water, in a ratio of 1:2.
• protect the underground parts of the building from moisture.
PREPARATION
Do not use on frozen or flooded surfaces. Clean the surface of dirt, glue, dust, loose parts and sharp edges. Clean the rust from the metal surface. If the surface is porous, level it with cement mortar and fill the voids. The foundation walls must be plastered and the new plaster or concrete must be dry and hardened. Remove protruding pieces of roofing material and other debris before re-roofing. Blisters and curved areas should be cut crosswise and glued with cold glue, and the surface should be primed with DISPROBIT primer mixture. To level the surface, fill all gaps and cavities with the leveling compound. Prime the substrate with DISPROBIT diluted 1:2 with water and allow to dry completely.
USE
Ready to use. Mix thoroughly before use. The mass is applied with a brush or trowel. Apply each layer after the previous one dries.
TECHNICAL DATA
• costs: for priming – 0.2-0.5 kg/m², for waterproofing – 0.8-1.2 kg/m² per layer.
• 1 layer drying time: up to 6 hours.
• number of layers: for priming – 1, for waterproofing 2-4.
• air and substrate temperature during use: from +5°C to +30°C.
• layer thickness: approximately 1 mm.
Cleaning of instruments: water, after drying – organic solvents.
DANGEROUS! H412 – Harmful to aquatic life, causes long lasting effects. P102 – Keep out of reach of children. EUH208 contains 1,2-benzisothiazol-3(2H)-one. May cause an allergic reaction.
Technical data and information are provided for use at a temperature of +23°C ± 2°C and a relative humidity of approximately 50%. Lower temperatures and higher humidity increase the drying time.
STORAGE
Store in a tightly closed package, away from heaters, at a temperature between +5°C and +35°C. Protect from direct sunlight.
Production date and expiration date on the package.
Storage and loading – on 3 floors.
Manufacturer: “Izolacja Matizol” Sp. z o. o. EU